Triple
T29895535
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Scarlet Lady-class |
E759267
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cruise ship class |
C14792
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cruise ship class Context triple: [Scarlet Lady-class, instanceOf, cruise ship class]
-
A.
cruise ship
chosen
A cruise ship is a large passenger vessel designed for leisure voyages, offering accommodations, dining, entertainment, and recreational activities while traveling between destinations.
-
B.
cruiser class
A cruiser class is a category of medium-sized, fast, and heavily armed warships designed for long-range missions, independent operations, and fleet support.
-
C.
Spirit-class ferry
The Spirit-class ferry is a large, double-ended passenger and vehicle vessel designed for high-capacity, short- to medium-distance coastal and inter-island routes.
-
D.
cruise ship fleet concept
A cruise ship fleet concept is a strategic design and operational framework that defines the composition, roles, branding, and deployment of multiple cruise vessels to serve targeted markets and itineraries as a cohesive portfolio.
-
E.
class of ships
A class of ships is a group of vessels built to a common design, sharing similar dimensions, capabilities, and intended roles within a navy or fleet.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2245f1cf88190978c70d1a1d2cb73 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 6:04 p.m.