Triple

T29883451
Position Surface form Disambiguated ID Type / Status
Subject Panama Canal ancillary facilities E758945 entity
Predicate instanceOf P0 FINISHED
Object supporting facilities C19689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: supporting facilities
Context triple: [Panama Canal ancillary facilities, instanceOf, supporting facilities]
  • A. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • B. facility chosen
    A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
  • C. maritime support facility
    A maritime support facility is a shore-based installation that provides logistical, maintenance, operational, and emergency services to vessels and maritime operations.
  • D. public service facility
    A public service facility is a place or infrastructure provided by government or community organizations to deliver essential services such as health, safety, education, or administration to the public.
  • E. maintenance facility
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2245de2f48190a481404896b56254 completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 5:58 p.m.