Triple
T29866232
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Command Authority |
E758464
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | national-level military command structure |
C55626
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: national-level military command structure Context triple: [National Command Authority, instanceOf, national-level military command structure]
-
A.
military structure
A military structure is an organized framework of ranks, units, and command relationships that defines how armed forces are arranged, governed, and coordinated to conduct operations.
-
B.
military administrative structure
A military administrative structure is the organized system of offices, roles, procedures, and chains of command that manage the planning, support, and governance of armed forces.
-
C.
United States military command
The United States military command is the hierarchical structure of authority and control through which national defense policies and military operations are directed, coordinated, and executed across all branches of the U.S. Armed Forces.
-
D.
central military command
chosen
A central military command is the highest-level organizational authority responsible for planning, directing, and coordinating the overall operations and strategy of a nation’s armed forces.
-
E.
civil-military coordination structure
A civil-military coordination structure is an organized framework that defines roles, processes, and communication channels between civilian authorities and military forces to plan, manage, and execute joint operations effectively and lawfully.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2245b4dec8190b85f664d918a00a5 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:51 p.m.