Triple
T29843587
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New York City Comprehensive Waterfront Plan |
E757867
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban waterfront plan |
C10710
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban waterfront plan Context triple: [New York City Comprehensive Waterfront Plan, instanceOf, urban waterfront plan]
-
A.
waterfront revitalization plan
chosen
A waterfront revitalization plan is a comprehensive strategy to transform underused or deteriorated shoreline areas into vibrant, accessible, and sustainable public and economic spaces.
-
B.
waterfront public space
A waterfront public space is a shared, accessible area along a body of water designed for recreation, social interaction, and enjoyment of the natural and urban waterfront environment.
-
C.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
D.
urban planning master plan
An urban planning master plan is a comprehensive, long-term framework that guides the physical, social, and economic development of a city or region through coordinated land use, infrastructure, and policy strategies.
-
E.
urban planning structure
An urban planning structure is a designed physical or organizational element within a city—such as streets, parks, zoning frameworks, or transit systems—that shapes how urban space is organized, used, and experienced.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224593f6c81908785a560fe659f58 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:40 p.m.