Triple
T29841002
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Neckar Valley Railway |
E757795
|
entity |
| Predicate | hasElectrificationCompleted |
P21852
|
FINISHED |
| Object | mid-20th century |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: mid-20th century | Statement: [Neckar Valley Railway, hasElectrificationCompleted, mid-20th century]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasElectrificationCompleted Context triple: [Neckar Valley Railway, hasElectrificationCompleted, mid-20th century]
-
A.
hasElectrificationStatus
Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
-
B.
electrificationCompleted
chosen
Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
-
C.
isElectrifiedSince
Indicates that an entity has had electrical power or electrification continuously from a specified point in time onward.
-
D.
isElectrificationPlanned
Indicates that there is an intention or scheduled plan to add or upgrade electrical infrastructure or services to the referenced entity or area.
-
E.
railElectrificationIncludes
Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224593f6c81908785a560fe659f58 |
completed | April 29, 2026, 3:31 p.m. |
| NER | Named-entity recognition | batch_69f6d6a6b04c8190bee4cf9c00665ef7 |
completed | May 3, 2026, 5:01 a.m. |
| PD | Predicate disambiguation | batch_69f6d26ceb08819091c71c001e954936 |
completed | May 3, 2026, 4:43 a.m. |
Created at: April 29, 2026, 5:39 p.m.