Triple
T29815307
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | UCI velodrome standards |
E757087
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sport facility standard |
C19580
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sport facility standard Context triple: [UCI velodrome standards, instanceOf, sport facility standard]
-
A.
stadium infrastructure standard
chosen
A stadium infrastructure standard defines the technical, safety, accessibility, and operational requirements that stadium facilities must meet to ensure consistent quality, performance, and compliance across venues.
-
B.
sports and recreation facility
A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
-
C.
sports facility operator
A sports facility operator is an entity responsible for managing, maintaining, and coordinating the use of sports venues and related services for athletes, teams, and the public.
-
D.
sports facilities planning project
A sports facilities planning project is a coordinated effort to assess needs, design, and strategically develop or upgrade sports venues and related infrastructure to optimally serve users and communities.
-
E.
sports architecture division
The sports architecture division is a specialized unit focused on planning, designing, and overseeing the construction or renovation of sports facilities and venues to optimize performance, safety, and spectator experience.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2245701c88190ad42415a0956c4ed |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:26 p.m.