Triple
T29803262
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 2019 Toddbrook Reservoir emergency |
E756768
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | dam safety emergency |
C56946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: dam safety emergency Context triple: [2019 Toddbrook Reservoir emergency, instanceOf, dam safety emergency]
-
A.
dam safety program
A dam safety program is a systematic framework of policies, procedures, inspections, monitoring, maintenance, and emergency planning designed to ensure that dams are planned, constructed, operated, and maintained to minimize the risk of failure and protect people, property, and the environment.
-
B.
dam failure
Dam failure is the sudden or progressive loss of a dam’s ability to retain water, leading to uncontrolled downstream flooding and potential catastrophic damage to life, property, and the environment.
-
C.
Dam
A dam is a large engineered barrier built across a waterway to control water flow, create reservoirs, and support purposes such as water supply, flood control, irrigation, and power generation.
-
D.
dam expansion project
A dam expansion project is a large-scale infrastructure initiative to increase an existing dam’s capacity, performance, or functionality—typically to enhance water storage, energy generation, or flood control—through structural modifications and associated environmental and social mitigation measures.
-
E.
dam removal project
A dam removal project is an organized effort to plan, deconstruct, and remove a dam to restore natural river flow, improve ecosystem health, and address safety or infrastructure concerns.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2245584848190ad4cab1f07752ccb |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:19 p.m.