Triple
T29780973
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Extended Range Cannon Artillery (ERCA) program |
E756112
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | U.S. Army weapons development program |
C10566
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: U.S. Army weapons development program Context triple: [Extended Range Cannon Artillery (ERCA) program, instanceOf, U.S. Army weapons development program]
-
A.
armored vehicle development program
A coordinated, multi-phase initiative that manages the research, design, testing, production, and fielding of new or upgraded armored combat vehicles to meet defined military requirements.
-
B.
U.S. Army aviation program
The U.S. Army aviation program encompasses the development, training, operation, and maintenance of rotary- and fixed-wing aircraft to provide air mobility, reconnaissance, attack, and support capabilities for Army missions.
-
C.
military program
chosen
A military program is an organized set of defense-related activities, projects, or initiatives designed to develop, maintain, or enhance a nation's armed forces capabilities and readiness.
-
D.
military project
A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
-
E.
U.S. Army training assessment
A U.S. Army training assessment is a structured evaluation process used to measure soldiers’ proficiency, readiness, and adherence to established training standards across required tasks and skills.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22451fb748190bbdbab401280affb |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 5:05 p.m.