Triple

T29766619
Position Surface form Disambiguated ID Type / Status
Subject GBAS E753930 entity
Predicate instanceOf P0 FINISHED
Object satellite-based navigation aid C2386 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: satellite-based navigation aid
Context triple: [GBAS, instanceOf, satellite-based navigation aid]
  • A. satellite navigation infrastructure component
    A satellite navigation infrastructure component is a physical or logical element—such as satellites, ground stations, control systems, or communication links—that collectively enables the generation, transmission, correction, and reception of positioning, navigation, and timing signals.
  • B. satellite navigation system feature
    A satellite navigation system feature is a specific capability or function within a satellite-based positioning system that enhances how location, routing, tracking, or related spatial information is calculated, presented, or used.
  • C. satellite-based augmentation system
    A satellite-based augmentation system is an overlay to global navigation satellite systems that uses additional satellites and ground stations to provide improved accuracy, integrity, and availability for positioning and navigation services.
  • D. navigational aid chosen
    A navigational aid is a tool, device, or system that helps users determine their position and plan or follow a route from one location to another.
  • E. regional navigation satellite system
    A regional navigation satellite system is a space-based infrastructure that provides positioning, navigation, and timing services over a specific geographic region rather than globally.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0ef827ff88190ade56e0b0846b713 completed April 28, 2026, 5:33 p.m.
Created at: April 28, 2026, 8:38 p.m.