Triple
T29740140
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sayre & Fisher Brick Company |
E752576
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | brick manufacturing company |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: brick manufacturing company Context triple: [Sayre & Fisher Brick Company, instanceOf, brick manufacturing company]
-
A.
cement company
A cement company is a business entity that manufactures and supplies cement and related construction materials for use in building and infrastructure projects.
-
B.
building material brand
A building material brand represents a company or label under which construction products and materials are marketed, recognized, and trusted for specific performance, quality, and aesthetic attributes in the building industry.
-
C.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
D.
fabbriceria
A fabbriceria is an Italian ecclesiastical body responsible for the administration, maintenance, and preservation of church buildings and their assets.
-
E.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0d62b064081908c1ae61cd68fb139 |
completed | April 28, 2026, 3:45 p.m. |
Created at: April 28, 2026, 7:47 p.m.