Triple

T29695236
Position Surface form Disambiguated ID Type / Status
Subject Linn County secondary roads system E751330 entity
Predicate planningCoordinatedWith P54367 FINISHED
Object Iowa Department of Transportation NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Iowa Department of Transportation | Statement: [Linn County secondary roads system, planningCoordinatedWith, Iowa Department of Transportation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: planningCoordinatedWith
Context triple: [Linn County secondary roads system, planningCoordinatedWith, Iowa Department of Transportation]
  • A. coordinatedWith
    Indicates that two or more entities have worked together in an organized, cooperative manner toward a shared task, goal, or activity.
  • B. coordinatedUnder
    Indicates that one entity is organized, directed, or managed under the authority or coordination of another entity.
  • C. plannedWith chosen
    Indicates that an entity created or arranged a plan in collaboration or coordination with another entity.
  • D. coordinatedWithin
    Indicates that one entity’s actions, processes, or states are organized and aligned in time or structure within the scope or framework defined by another entity.
  • E. plannedVia
    Indicates that something is arranged, organized, or scheduled by means of a particular method, process, or intermediary.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0d6266f8481909e70bb41cda18587 completed April 28, 2026, 3:45 p.m.
NER Named-entity recognition batch_69f73ae120bc8190bff94d38d7a7a00d completed May 3, 2026, 12:09 p.m.
PD Predicate disambiguation batch_69f73a38d0848190aa5139144b8561c6 completed May 3, 2026, 12:06 p.m.
Created at: April 28, 2026, 7:19 p.m.