Triple
T29695198
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Linn County secondary roads system |
E751330
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | county road system |
C25813
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: county road system Context triple: [Linn County secondary roads system, instanceOf, county road system]
-
A.
Farm to Market Road
A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
-
B.
county highway in California
chosen
A county highway in California is a locally maintained public road designated and managed by a county government to provide regional connectivity between cities, towns, and rural areas within that county.
-
C.
road network
A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
-
D.
radial road
A radial road is a major route that extends outward from a central point, such as a city center, to connect it with surrounding areas.
-
E.
Arizona State Route
An Arizona State Route is a numbered highway within the Arizona state highway system that facilitates regional and local transportation across various parts of the state.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0d6266f8481909e70bb41cda18587 |
completed | April 28, 2026, 3:45 p.m. |
Created at: April 28, 2026, 7:19 p.m.