Triple
T29684466
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | VORTAC NSE |
E751046
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | VORTAC station |
C56081
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: VORTAC station Context triple: [VORTAC NSE, instanceOf, VORTAC station]
-
A.
air traffic control tower
A structure at an airport from which air traffic controllers monitor and direct aircraft movements on the ground and in the airspace around the airport to ensure safe and efficient operations.
-
B.
radiotelephony designator
A radiotelephony designator is a standardized spoken identifier assigned to an aircraft operator, airline, or aviation service for use in voice radio communications.
-
C.
aviation infrastructure network
An aviation infrastructure network is an interconnected system of airports, airways, navigation aids, communication systems, and support facilities that collectively enable the safe, efficient movement of aircraft and passengers.
-
D.
CEVA station
A CEVA station is a railway station located along the CEVA (Cornavin–Eaux-Vives–Annemasse) line, serving as a passenger access point to regional and cross-border train services in the Geneva area.
-
E.
private aviation terminal
A private aviation terminal is a specialized airport facility that provides exclusive, streamlined services and amenities for private and corporate aircraft, their passengers, and crews.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0d625b09481909b0b69aea1e846c8 |
completed | April 28, 2026, 3:45 p.m. |
Created at: April 28, 2026, 7:12 p.m.