Triple

T29681810
Position Surface form Disambiguated ID Type / Status
Subject China Railway Nanchang Group E750970 entity
Predicate railwayAdministrationModel P177149 FINISHED
Object group company under China State Railway Group LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: group company under China State Railway Group | Statement: [China Railway Nanchang Group, railwayAdministrationModel, group company under China State Railway Group]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railwayAdministrationModel
Context triple: [China Railway Nanchang Group, railwayAdministrationModel, group company under China State Railway Group]
  • A. railwayInfrastructureManager
    Indicates that one entity is responsible for managing, maintaining, and operating the railway infrastructure used by another entity.
  • B. railwayAdministrationType chosen
    Indicates the type or category of administrative authority responsible for managing or overseeing a railway.
  • C. railwayAdministrationCode
    Indicates the code assigned by a railway authority or administration that identifies which railway organization is responsible for or manages a given entity.
  • D. railcodeSystem
    Indicates a relationship where a rail-specific code is assigned to, used by, or governs a particular system within a railway context.
  • E. railwayAdaptation
    Indicates that something has been modified, designed, or adjusted specifically for use with or on a railway system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0d624d7b08190ba237d226f78d0d9 completed April 28, 2026, 3:45 p.m.
NER Named-entity recognition batch_69f6fb19063c81909466b329655c8583 completed May 3, 2026, 7:36 a.m.
PD Predicate disambiguation batch_69f6f969b4cc8190afb473a2d8b110bc completed May 3, 2026, 7:29 a.m.
Created at: April 28, 2026, 7:10 p.m.