Triple
T2965506
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jachin |
E80151
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bronze pillar |
C10207
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bronze pillar Context triple: [Jachin, instanceOf, bronze pillar]
-
A.
obelisk
An obelisk is a tall, four-sided, narrow tapering monument that ends in a pyramid-shaped top, typically carved from a single stone and often erected as a commemorative or ceremonial structure.
-
B.
stone monument
A stone monument is a durable, often large-scale structure carved or assembled from stone to commemorate people, events, beliefs, or cultural values.
-
C.
granite monolith
A granite monolith is a massive, singular block of hard, coarse-grained igneous rock, often standing prominently as a natural or sculpted geological feature.
-
D.
sphinx statue
A sphinx statue is a sculpted representation of a mythical creature with a human head and a lion’s body, often serving as a monumental guardian figure in architectural or ceremonial contexts.
-
E.
symbolic monument feature
chosen
A symbolic monument feature is a designed physical element or structure that represents, commemorates, or communicates cultural, historical, or ideological meanings within a landscape or built environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b1341848190bd19dbf46892887d |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 2:58 p.m.