Triple
T29648762
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | India–Myanmar–Thailand Trilateral Highway |
E756077
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international highway project |
C48020
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international highway project Context triple: [India–Myanmar–Thailand Trilateral Highway, instanceOf, international highway project]
-
A.
international transport project
chosen
An international transport project is a coordinated initiative that plans, finances, and implements cross-border transportation infrastructure or services to improve connectivity, efficiency, and economic integration between countries.
-
B.
international road
An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
-
C.
toll road project
A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
-
D.
Interstate Highway
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
-
E.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0ef89d2c88190a6d0d5116ccd7cc9 |
completed | April 28, 2026, 5:34 p.m. |
Created at: April 28, 2026, 6:51 p.m.