Triple

T2960835
Position Surface form Disambiguated ID Type / Status
Subject Highbury E80042 entity
Predicate preservedElement P17760 FINISHED
Object East Stand facade
The East Stand facade is the iconic Art Deco exterior of Arsenal’s former Highbury stadium, preserved as a historic architectural feature within the modern residential development on the site.
E313911 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: East Stand facade | Statement: [Highbury, preservedElement, East Stand facade]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: East Stand facade
Context triple: [Highbury, preservedElement, East Stand facade]
  • A. East Stand
    The East Stand is one of the main spectator stands at Old Trafford stadium, providing seating and facilities for fans watching Manchester United home matches.
  • B. East Stand
    East Stand is a spectator seating section of Loftus Versfeld Stadium in Pretoria, South Africa, used for viewing rugby and football matches.
  • C. East Stand
    The East Stand is one of the main spectator stands at Manchester City's home ground, the City of Manchester Stadium (Etihad Stadium), providing seating, facilities, and views of the pitch for fans.
  • D. East Stand
    East Stand is one of the main spectator seating sections of Dublin’s Aviva Stadium, running along the eastern side of the arena.
  • E. East Stand
    East Stand is a spectator seating section of the Peninsula Stadium, home to Salford City FC in Greater Manchester, England.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: East Stand facade
Triple: [Highbury, preservedElement, East Stand facade]
Generated description
The East Stand facade is the iconic Art Deco exterior of Arsenal’s former Highbury stadium, preserved as a historic architectural feature within the modern residential development on the site.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: East Stand facade
Target entity description: The East Stand facade is the iconic Art Deco exterior of Arsenal’s former Highbury stadium, preserved as a historic architectural feature within the modern residential development on the site.
  • A. East Stand
    The East Stand is one of the main spectator stands at Old Trafford stadium, providing seating and facilities for fans watching Manchester United home matches.
  • B. East Stand
    The East Stand is one of the main spectator stands at Manchester City's home ground, the City of Manchester Stadium (Etihad Stadium), providing seating, facilities, and views of the pitch for fans.
  • C. East Stand
    East Stand is a spectator seating section of Loftus Versfeld Stadium in Pretoria, South Africa, used for viewing rugby and football matches.
  • D. East Stand
    East Stand is one of the main spectator seating sections of Dublin’s Aviva Stadium, running along the eastern side of the arena.
  • E. East Stand
    East Stand is a spectator seating section of the Peninsula Stadium, home to Salford City FC in Greater Manchester, England.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: preservedElement
Context triple: [Highbury, preservedElement, East Stand facade]
  • A. preservedExample
    Indicates that an example instance has been kept intact or maintained in its original state for future reference or use.
  • B. preservesFeature chosen
    Indicates that one entity maintains or keeps intact a particular feature, property, or characteristic of another entity during some process or interaction.
  • C. partiallyPreserved
    Indicates that the referenced entity or object is only incompletely intact, with some parts missing, damaged, or lost while others remain.
  • D. preservedAt
    Indicates that something is kept, maintained, or conserved in a particular place or context.
  • E. preservedUnits
    Indicates that certain units or components of something have been kept intact and unchanged rather than altered, removed, or destroyed.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b1341848190bd19dbf46892887d completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad995454448190834aa5d47a4ed5ac completed March 8, 2026, 3:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69b0fc923d888190a68075dfaa9e90b2 completed March 11, 2026, 5:24 a.m.
NEDg Description generation batch_69b0fd7d1cc88190a4f533a92d7e6de3 completed March 11, 2026, 5:28 a.m.
NED2 Entity disambiguation (via description) batch_69b0fde74b608190b59da720c90adfeb completed March 11, 2026, 5:30 a.m.
PD Predicate disambiguation batch_69ad960c5c8881909d679912bd7d78f3 completed March 8, 2026, 3:30 p.m.
Created at: March 8, 2026, 2:57 p.m.