Triple

T29575279
Position Surface form Disambiguated ID Type / Status
Subject CICS Transaction Gateway E753427 entity
Predicate instanceOf P0 FINISHED
Object CICS connectivity product C8820 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CICS connectivity product
Context triple: [CICS Transaction Gateway, instanceOf, CICS connectivity product]
  • A. IBM mainframe networking technology
    IBM mainframe networking technology encompasses the hardware, software, and protocols (such as SNA and VTAM) that enable secure, high-volume, and reliable communication between IBM mainframes and distributed systems.
  • B. IBM 3270 family device
    An IBM 3270 family device is a block-oriented terminal or controller used to interact with mainframe systems, optimized for high-speed, low-overhead data entry and display in enterprise environments.
  • C. mainframe security product
    A mainframe security product is a software solution that protects mainframe systems by controlling access, monitoring activity, enforcing compliance policies, and safeguarding critical data and applications from internal and external threats.
  • D. 3270 controller
    A 3270 controller is a hardware device that manages communication and data flow between IBM 3270 display terminals and a mainframe computer over a terminal network.
  • E. IBM product chosen
    An IBM product is a hardware, software, or service offering developed and marketed by IBM to address business, technology, and enterprise computing needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0ef80bf8c8190ad286e99f7df0c63 completed April 28, 2026, 5:33 p.m.
Created at: April 28, 2026, 6:02 p.m.