Triple
T29571626
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Griffith Company |
E753326
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | civil engineering contractor |
C45754
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: civil engineering contractor Context triple: [Griffith Company, instanceOf, civil engineering contractor]
-
A.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
B.
commercial general contractor
A commercial general contractor is a professional or firm responsible for overseeing, coordinating, and managing all aspects of non-residential construction projects from planning through completion.
-
C.
construction pioneer
A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
-
D.
industrial contractor
chosen
An industrial contractor is a specialized company or individual responsible for planning, managing, and executing construction, installation, maintenance, or upgrade projects within industrial facilities such as factories, plants, and warehouses.
-
E.
civil engineering support organization
A civil engineering support organization is an entity that provides specialized technical, logistical, administrative, and project management services to assist civil engineers and infrastructure projects throughout their lifecycle.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0ef7fcb4881908a933110adb9bda1 |
completed | April 28, 2026, 5:33 p.m. |
Created at: April 28, 2026, 5:59 p.m.