Triple
T29548464
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Galactic City |
E749693
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planet-wide city |
C55889
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planet-wide city Context triple: [Galactic City, instanceOf, planet-wide city]
-
A.
celestial city
A celestial city is a radiant, otherworldly metropolis often envisioned in the heavens, embodying divine order, harmony, and transcendent beauty.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
Aeolian city
An Aeolian city is a conceptual urban environment shaped and sustained by wind-driven processes, where architecture, infrastructure, and daily life are dynamically adapted to constant atmospheric movement.
-
D.
proto-city
A proto-city is an early, emergent urban settlement characterized by growing population density, rudimentary infrastructure, and nascent social, economic, and political organization that precedes a fully developed city.
-
E.
domed city
A domed city is a self-contained urban environment enclosed under a protective dome that regulates climate and shields inhabitants from a hostile or unstable outside world.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0bd48691081908cecad39bac591e0 |
completed | April 28, 2026, 1:59 p.m. |
Created at: April 28, 2026, 5:10 p.m.