Triple
T2953946
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SAM 27000 |
E79886
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Boeing VC-137C |
C1117
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Boeing VC-137C Context triple: [SAM 27000, instanceOf, Boeing VC-137C]
-
A.
X-plane
An X-plane is an experimental aircraft designed to test and demonstrate new aviation technologies, configurations, or performance capabilities beyond those of conventional aircraft.
-
B.
United States presidential aircraft designation
chosen
A United States presidential aircraft designation is the specific call sign or model identifier assigned to an aircraft when it is used to transport the President of the United States, such as "Air Force One" for Air Force-operated planes.
-
C.
Boeing 747 variant
A Boeing 747 variant is a specific model or configuration of the Boeing 747 airliner, distinguished by differences in size, range, engines, avionics, or interior layout tailored to particular airline or mission requirements.
-
D.
jet airliner
A jet airliner is a large, powered aircraft designed to transport passengers and cargo over medium to long distances using jet engines for high-speed, high-altitude flight.
-
E.
strategic airlifter
A strategic airlifter is a large military transport aircraft designed to carry heavy cargo, troops, and equipment over long distances to support global deployment and sustainment operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b1276588190a374a0b12e0f7bdf |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 2:57 p.m.