Triple

T29530610
Position Surface form Disambiguated ID Type / Status
Subject Germany–Scandinavia E749190 entity
Predicate instanceOf P0 FINISHED
Object international transport route system C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: international transport route system
Context triple: [Germany–Scandinavia, instanceOf, international transport route system]
  • A. international air route
    An international air route is a designated flight path that connects airports in different countries, governed by bilateral or multilateral agreements and aviation regulations.
  • B. international transport project
    An international transport project is a coordinated initiative that plans, finances, and implements cross-border transportation infrastructure or services to improve connectivity, efficiency, and economic integration between countries.
  • C. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • D. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • E. international road
    An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0bd46d99c81908ba9d01cc1dbef7d completed April 28, 2026, 1:59 p.m.
Created at: April 28, 2026, 4:52 p.m.