Triple
T29517056
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | سازمان برنامه و بودجه کشور |
E748827
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | نهاد برنامهریزی |
C24823
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: نهاد برنامهریزی Context triple: [سازمان برنامه و بودجه کشور, instanceOf, نهاد برنامهریزی]
-
A.
نهاد اجرایی
نهاد اجرایی سازمان یا ساختاری رسمی در نظام حکمرانی است که مسئول اجرای قوانین، سیاستها و تصمیمات مصوب و اداره امور اجرایی کشور یا سازمان میباشد.
-
B.
plan
A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
-
C.
programme of work
A programme of work is a structured, time-bound collection of related tasks and activities organized to achieve specific objectives or deliver defined outcomes.
-
D.
politico-military planning process
The politico-military planning process is a coordinated, iterative decision-making framework that integrates political objectives and military capabilities to develop, assess, and select feasible strategies and courses of action for achieving national or alliance security goals.
-
E.
نهاد حکومتی
chosen
نهاد حکومتی سازمانی رسمی و ساختاریافته در درون حاکمیت است که برای اعمال قدرت سیاسی، اجرای قوانین، ارائه خدمات عمومی و تنظیم روابط میان دولت و شهروندان ایجاد میشود.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0bd461c208190bec20bbf24e02cc5 |
completed | April 28, 2026, 1:59 p.m. |
Created at: April 28, 2026, 4:38 p.m.