Triple
T29494676
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oyama Shrine gate |
E748184
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shrine gate |
C30378
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shrine gate Context triple: [Oyama Shrine gate, instanceOf, shrine gate]
-
A.
entrance gate
An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
-
B.
shrine board
A shrine board is an organized governing body responsible for managing, maintaining, and overseeing the operations, rituals, and development of a religious shrine or temple complex.
-
C.
Japanese gate
chosen
A Japanese gate is a traditional architectural structure, often called a torii or mon, that marks the entrance to a sacred or significant space and symbolically separates the mundane world from the spiritual or special area beyond.
-
D.
Tenman-gū shrine
A Tenman-gū shrine is a Shinto shrine dedicated to Sugawara no Michizane, revered as Tenjin, the kami of scholarship, learning, and the arts.
-
E.
city pillar shrine
A city pillar shrine is a sacred structure, often centrally located in a town or city, that houses a symbolic pillar believed to protect and spiritually anchor the community.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0bd448c6881908aa6b475cefd5ddc |
completed | April 28, 2026, 1:59 p.m. |
Created at: April 28, 2026, 4:17 p.m.