Triple
T29447096
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Porsche Active Suspension Management |
E746881
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electronic damping control system |
C8156
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electronic damping control system Context triple: [Porsche Active Suspension Management, instanceOf, electronic damping control system]
-
A.
adaptive suspension system
chosen
An adaptive suspension system is a vehicle suspension technology that continuously adjusts damping and stiffness in real time based on driving conditions, road surface, and driver inputs to optimize comfort, handling, and stability.
-
B.
one-pedal driving system
A one-pedal driving system is a vehicle control feature that allows the driver to accelerate and decelerate using only the accelerator pedal by automatically applying regenerative and/or friction braking when the pedal is released.
-
C.
electromechanical oscillator
An electromechanical oscillator is a device that converts electrical energy into periodic mechanical motion (and often back into electrical signals), producing sustained oscillations at a characteristic frequency.
-
D.
central control system
A central control system is a coordinating entity that monitors, manages, and directs the operations of interconnected components or subsystems to achieve overall system objectives.
-
E.
export control law
Export control law is the body of legal rules and regulations that govern the transfer of goods, technology, software, and services across national borders to protect national security, foreign policy interests, and international obligations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0a7a230488190b44a97fe3d16f731 |
completed | April 28, 2026, 12:27 p.m. |
Created at: April 28, 2026, 3:28 p.m.