Triple

T29447096
Position Surface form Disambiguated ID Type / Status
Subject Porsche Active Suspension Management E746881 entity
Predicate instanceOf P0 FINISHED
Object electronic damping control system C8156 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electronic damping control system
Context triple: [Porsche Active Suspension Management, instanceOf, electronic damping control system]
  • A. adaptive suspension system chosen
    An adaptive suspension system is a vehicle suspension technology that continuously adjusts damping and stiffness in real time based on driving conditions, road surface, and driver inputs to optimize comfort, handling, and stability.
  • B. one-pedal driving system
    A one-pedal driving system is a vehicle control feature that allows the driver to accelerate and decelerate using only the accelerator pedal by automatically applying regenerative and/or friction braking when the pedal is released.
  • C. electromechanical oscillator
    An electromechanical oscillator is a device that converts electrical energy into periodic mechanical motion (and often back into electrical signals), producing sustained oscillations at a characteristic frequency.
  • D. central control system
    A central control system is a coordinating entity that monitors, manages, and directs the operations of interconnected components or subsystems to achieve overall system objectives.
  • E. export control law
    Export control law is the body of legal rules and regulations that govern the transfer of goods, technology, software, and services across national borders to protect national security, foreign policy interests, and international obligations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a7a230488190b44a97fe3d16f731 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 3:28 p.m.