Triple

T29435999
Position Surface form Disambiguated ID Type / Status
Subject EGS E746574 entity
Predicate instanceOf P0 FINISHED
Object ground systems program C32733 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground systems program
Context triple: [EGS, instanceOf, ground systems program]
  • A. ground tracking facility
    A ground tracking facility is a terrestrial station equipped with antennas, sensors, and communication systems used to monitor, communicate with, and control spacecraft or other remote vehicles.
  • B. ground segment equipment
    Ground segment equipment comprises the terrestrial hardware and software systems that support, control, communicate with, and process data from space-based assets such as satellites.
  • C. NASA program infrastructure chosen
    NASA program infrastructure encompasses the organizational structures, facilities, technologies, processes, and support systems that enable the planning, execution, and management of NASA’s missions and research programs.
  • D. NASA ground support equipment
    NASA ground support equipment comprises the specialized tools, structures, and systems used on the ground to assemble, test, transport, service, and launch spacecraft and launch vehicles safely and reliably.
  • E. NASA field center precursor
    A NASA field center precursor is an early organizational entity, facility, or program that laid the technical, institutional, or infrastructural groundwork for the later establishment of a formal NASA field center.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a7a180e48190ae775e40047dbcb5 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 3:16 p.m.