Triple
T2941115
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metrobus (Miami-Dade County) |
E79387
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bus rapid transit and local bus network |
C911
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bus rapid transit and local bus network Context triple: [Metrobus (Miami-Dade County), instanceOf, bus rapid transit and local bus network]
-
A.
bus rapid transit line
A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
-
B.
public transit system
chosen
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
rapid transit line
A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
-
E.
trolleybus line
A trolleybus line is a designated public transit route served by electrically powered buses that draw current from overhead wires along the roadway.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b0fbab081908f6a61567c045d8d |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 2:56 p.m.