Triple

T29407381
Position Surface form Disambiguated ID Type / Status
Subject PyGObject E745806 entity
Predicate instanceOf P0 FINISHED
Object GNOME development library C24722 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: GNOME development library
Context triple: [PyGObject, instanceOf, GNOME development library]
  • A. GNOME component chosen
    A GNOME component is a modular software element within the GNOME desktop environment that provides specific functionality or services, such as panels, applets, libraries, or system tools, to create a cohesive user experience.
  • B. GNOME application
    A GNOME application is a software program designed to integrate with the GNOME desktop environment, following its human interface guidelines, technologies, and design principles to provide a consistent user experience.
  • C. MATE desktop component
    A MATE desktop component is an individual software element (such as a panel, applet, or system tool) that provides a specific piece of functionality within the MATE desktop environment.
  • D. graphics library
    A graphics library is a collection of reusable functions, classes, and tools that simplify creating, manipulating, and rendering visual content such as shapes, images, and animations on various display devices.
  • E. Vala
    Vala is a statically typed, object-oriented programming language that brings modern language features to the GNOME platform while compiling down to efficient C code.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79eb7d081908c67197a5f347e68 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:55 p.m.