Triple

T29395599
Position Surface form Disambiguated ID Type / Status
Subject living root bridges of Nongriat E745491 entity
Predicate instanceOf P0 FINISHED
Object bioengineered footbridge C3860 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bioengineered footbridge
Context triple: [living root bridges of Nongriat, instanceOf, bioengineered footbridge]
  • A. tensegrity bridge
    A tensegrity bridge is a lightweight, stable structure that uses a network of isolated compression elements (like struts) suspended within a continuous system of tension elements (like cables) to span a distance efficiently.
  • B. pedestrian bridge chosen
    A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
  • C. wooden footbridge
    A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
  • D. multipurpose bridge
    A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
  • E. prefabricated bridge
    A prefabricated bridge is a modular bridge structure whose components are manufactured off-site in controlled conditions and then transported and assembled rapidly at the installation location.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79dfabc81908755382ee47791e2 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:46 p.m.