Triple
T29395599
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | living root bridges of Nongriat |
E745491
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bioengineered footbridge |
C3860
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bioengineered footbridge Context triple: [living root bridges of Nongriat, instanceOf, bioengineered footbridge]
-
A.
tensegrity bridge
A tensegrity bridge is a lightweight, stable structure that uses a network of isolated compression elements (like struts) suspended within a continuous system of tension elements (like cables) to span a distance efficiently.
-
B.
pedestrian bridge
chosen
A pedestrian bridge is a raised structure designed exclusively for people on foot (and often cyclists) to safely cross obstacles such as roads, railways, or waterways without interacting with vehicular traffic.
-
C.
wooden footbridge
A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
-
D.
multipurpose bridge
A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
-
E.
prefabricated bridge
A prefabricated bridge is a modular bridge structure whose components are manufactured off-site in controlled conditions and then transported and assembled rapidly at the installation location.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0a79dfabc81908755382ee47791e2 |
completed | April 28, 2026, 12:27 p.m. |
Created at: April 28, 2026, 2:46 p.m.