Triple

T29393242
Position Surface form Disambiguated ID Type / Status
Subject Branscomb Glacier route E745426 entity
Predicate instanceOf P0 FINISHED
Object standard route C27175 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: standard route
Context triple: [Branscomb Glacier route, instanceOf, standard route]
  • A. standard ascent route chosen
    A standard ascent route is the most commonly used and generally accepted path taken to climb a particular mountain or peak, typically chosen for its balance of safety, accessibility, and efficiency.
  • B. standard
    A standard is an established norm, rule, or benchmark used to measure, compare, or guide quality, performance, or behavior within a particular context.
  • C. transportation route
    A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
  • D. spur route
    A spur route is a short roadway that branches off from a main highway or route to provide direct access to a specific destination or area.
  • E. spur route
    A spur route is a short, secondary road or railway line that branches off from a main route to provide direct access to a specific location or area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79dfabc81908755382ee47791e2 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:44 p.m.