Triple

T29388827
Position Surface form Disambiguated ID Type / Status
Subject RFC 2911 E745322 entity
Predicate instanceOf P0 FINISHED
Object Internet standard track specification C55730 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Internet standard track specification
Context triple: [RFC 2911, instanceOf, Internet standard track specification]
  • A. FIA circuit grading standard
    The FIA circuit grading standard is a classification system that assigns safety and technical grades to motor racing circuits based on their design, infrastructure, and suitability for different categories of competition.
  • B. transportation standard
    A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
  • C. railway technical standard
    A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
  • D. T11 standard
    T11 standard is a conceptual classification defining a specific set of technical, performance, or safety requirements that systems or components must meet to ensure compatibility and consistent operation within a given domain.
  • E. United States railroad standard
    United States railroad standard: A conceptual class representing the set of technical, operational, and safety specifications that govern the design, construction, and operation of railroads within the United States.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79dfabc81908755382ee47791e2 completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:41 p.m.