Triple
T29388827
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | RFC 2911 |
E745322
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Internet standard track specification |
C55730
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Internet standard track specification Context triple: [RFC 2911, instanceOf, Internet standard track specification]
-
A.
FIA circuit grading standard
The FIA circuit grading standard is a classification system that assigns safety and technical grades to motor racing circuits based on their design, infrastructure, and suitability for different categories of competition.
-
B.
transportation standard
A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
-
C.
railway technical standard
A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
-
D.
T11 standard
T11 standard is a conceptual classification defining a specific set of technical, performance, or safety requirements that systems or components must meet to ensure compatibility and consistent operation within a given domain.
-
E.
United States railroad standard
United States railroad standard: A conceptual class representing the set of technical, operational, and safety specifications that govern the design, construction, and operation of railroads within the United States.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0a79dfabc81908755382ee47791e2 |
completed | April 28, 2026, 12:27 p.m. |
Created at: April 28, 2026, 2:41 p.m.