Triple

T29362580
Position Surface form Disambiguated ID Type / Status
Subject Environmental, Social and Governance Committee of Starbucks E744629 entity
Predicate instanceOf P0 FINISHED
Object ESG committee C4031 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ESG committee
Context triple: [Environmental, Social and Governance Committee of Starbucks, instanceOf, ESG committee]
  • A. compliance committee
    A compliance committee is a designated group within an organization responsible for overseeing, monitoring, and guiding adherence to legal, regulatory, and internal policy requirements.
  • B. board committee chosen
    A board committee is a small, specialized group of board members delegated specific responsibilities to support the board’s governance, oversight, and decision-making functions.
  • C. Specialized committee
    A specialized committee is a focused group of individuals formed within a larger organization to address, investigate, or manage specific issues, tasks, or areas of expertise.
  • D. BIS committee
    A BIS committee is a formal group within the Bureau of Indian Standards responsible for developing, reviewing, and maintaining national standards in a specific technical or sectoral domain.
  • E. ethics commission
    An ethics commission is an independent body that reviews, advises on, and enforces standards of ethical conduct within an organization, profession, or government.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79aee588190b490f19d93c6e52d completed April 28, 2026, 12:27 p.m.
Created at: April 28, 2026, 2:19 p.m.