Triple

T29359659
Position Surface form Disambiguated ID Type / Status
Subject San José de Flores E744550 entity
Predicate electrificationSystemOfLine P5320 FINISHED
Object overhead catenary LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: overhead catenary | Statement: [San José de Flores, electrificationSystemOfLine, overhead catenary]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrificationSystemOfLine
Context triple: [San José de Flores, electrificationSystemOfLine, overhead catenary]
  • A. electrificationSystem chosen
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • B. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • C. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • D. numberOfElectrifiedLines
    Indicates the quantity of railway or transit lines within a system or network that are equipped with electrical power infrastructure for operation.
  • E. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0a79aee588190b490f19d93c6e52d completed April 28, 2026, 12:27 p.m.
NER Named-entity recognition batch_69fd509e6bc08190b263923c2f40fea3 completed May 8, 2026, 2:55 a.m.
PD Predicate disambiguation batch_69fd4fd1a58881909d4b84de1b24e380 completed May 8, 2026, 2:52 a.m.
Created at: April 28, 2026, 2:16 p.m.