Triple

T29343149
Position Surface form Disambiguated ID Type / Status
Subject CompuPro E744090 entity
Predicate instanceOf P0 FINISHED
Object S-100 bus vendor C54868 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: S-100 bus vendor
Context triple: [CompuPro, instanceOf, S-100 bus vendor]
  • A. S-100 bus computer
    An S-100 bus computer is a microcomputer system built around the S-100 expansion bus standard, using a backplane and plug-in cards for CPU, memory, and I/O to create a modular, expandable architecture.
  • B. local bus
    A local bus is a public transportation vehicle that operates on fixed routes within a limited geographic area, making frequent stops to pick up and drop off passengers.
  • C. trolleybus manufacturer
    A trolleybus manufacturer is a company that designs, engineers, and produces electrically powered buses that draw current from overhead wires for urban and suburban public transportation systems.
  • D. bus model
    A bus model is a conceptual representation of a bus, capturing its structural components, behavior, and interactions within a transportation system for purposes such as design, simulation, or analysis.
  • E. diesel-powered highway bus
    A diesel-powered highway bus is a large, long-distance passenger vehicle designed for high-speed road travel, propelled by a diesel engine for efficient, sustained operation over extended routes.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f09126cfcc8190899b16fbf3c2bf7b completed April 28, 2026, 10:51 a.m.
Created at: April 28, 2026, 1:34 p.m.