Triple

T29306637
Position Surface form Disambiguated ID Type / Status
Subject Halo Infinite E743111 entity
Predicate initiallyPlannedReleaseYear P14322 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [Halo Infinite, initiallyPlannedReleaseYear, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: initiallyPlannedReleaseYear
Context triple: [Halo Infinite, initiallyPlannedReleaseYear, 2020]
  • A. originalPlannedLaunchYear chosen
    Indicates the year that was initially scheduled or intended for an entity’s launch before any delays or changes.
  • B. yearOfLaunch
    Indicates the specific calendar year in which an entity (such as a product, mission, or project) was first launched or released.
  • C. deploymentYear
    Indicates the calendar year in which an entity (such as a system, product, or resource) was first put into active use or operation.
  • D. yearAnnounced
    Indicates the calendar year in which something (such as a product, event, or decision) was formally announced.
  • E. plannedEndYear
    Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f09123ed9881909f351f7541933f5e completed April 28, 2026, 10:51 a.m.
NER Named-entity recognition batch_69f6d0d46aec819091edf97324d793ac completed May 3, 2026, 4:36 a.m.
PD Predicate disambiguation batch_69f6cfe2183481908ae4e85a59c66f69 completed May 3, 2026, 4:32 a.m.
Created at: April 28, 2026, 1:14 p.m.