Triple
T29285598
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Strela cargo crane |
E742502
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | articulating boom |
C37599
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: articulating boom Context triple: [Strela cargo crane, instanceOf, articulating boom]
-
A.
aerial lift
An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
-
B.
cantilever crane
A cantilever crane is a lifting device with a horizontal beam fixed at one end and projecting outward to support loads without additional vertical support at the free end.
-
C.
crane
chosen
A crane is a large, tall machine equipped with hoists, cables, and pulleys used to lift and move heavy materials in construction, manufacturing, and shipping operations.
-
D.
gantry crane
A gantry crane is a type of overhead crane that straddles its workspace on legs or supports, moving along rails or wheels to lift and transport heavy loads.
-
E.
articulated vehicle
An articulated vehicle is a multi-section vehicle, such as a tractor-trailer or bendy bus, whose segments are connected by a pivoting joint to allow greater maneuverability and load capacity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f09121ed8c8190b4cb27be3619c262 |
completed | April 28, 2026, 10:51 a.m. |
Created at: April 28, 2026, 12:58 p.m.