Triple
T292804
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hartford, Connecticut, United States |
E6029
|
entity |
| Predicate | roadJunctionOf |
P6234
|
FINISHED |
| Object | Interstate 84 |
E33869
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 84 | Statement: [Hartford, Connecticut, United States, roadJunctionOf, Interstate 84]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 84 Context triple: [Hartford, Connecticut, United States, roadJunctionOf, Interstate 84]
-
A.
Interstate 84
chosen
Interstate 84 is a major east–west U.S. highway in the Northeast that serves as a key regional route connecting parts of Pennsylvania, New York, Connecticut, and Massachusetts.
-
B.
Interstate 84
Interstate 84 is a major east–west U.S. Interstate Highway in the Pacific Northwest that runs through Oregon and Idaho, serving as a key route between Portland and the inland Northwest.
-
C.
Interstate 81
Interstate 81 is a major north–south U.S. highway running primarily through the Appalachian region from Tennessee to the Canadian border in New York, serving as a key freight and travel corridor.
-
D.
Interstate 395
Interstate 395 is a major auxiliary Interstate Highway in the eastern United States that connects Washington, D.C. with suburban Virginia and serves as a key commuter and regional traffic corridor.
-
E.
Interstate 93
Interstate 93 is a major north–south highway in the New England region of the United States, running from Massachusetts through New Hampshire into Vermont and serving as a key route for regional travel and commerce.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: roadJunctionOf Context triple: [Hartford, Connecticut, United States, roadJunctionOf, Interstate 84]
-
A.
roadJunctionIncludes
chosen
Indicates that a road junction spatially contains or encompasses a specific road segment or related roadway element as part of its structure.
-
B.
roadFeature
Indicates that an entity is a specific physical or functional characteristic associated with a road, such as its structure, markings, or related infrastructure.
-
C.
roadSystem
Indicates a relationship where multiple roads are organized and connected as part of a larger, integrated transportation network or infrastructure.
-
D.
roadType
Indicates the classification or category of a road based on its functional or physical characteristics.
-
E.
roadName
Indicates the specific name assigned to a road that identifies it within a transportation or address system.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a2e79114b081909490b3bf5a5dbb51 |
completed | Feb. 28, 2026, 1:03 p.m. |
| NER | Named-entity recognition | batch_69a2ea0dd1dc8190aecd5afdeb2fd74b |
completed | Feb. 28, 2026, 1:13 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad158273188190ba7d9005161f4a70 |
completed | March 8, 2026, 6:21 a.m. |
| PD | Predicate disambiguation | batch_69a2e934b4408190b53a17f57a02df65 |
completed | Feb. 28, 2026, 1:10 p.m. |
Created at: Feb. 28, 2026, 1:06 p.m.