Triple
T29277034
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Philippine Development Plan |
E742271
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | medium-term development plan |
C55158
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: medium-term development plan Context triple: [Philippine Development Plan, instanceOf, medium-term development plan]
-
A.
long-term plan
A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
-
B.
planned development
A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
-
C.
planned sector
A planned sector is a designated area within a city or region that is systematically organized and developed according to a comprehensive plan for land use, infrastructure, and services.
-
D.
short-range transportation plan
A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
-
E.
regional planning program
A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0912124d48190a046642b69407f4c |
completed | April 28, 2026, 10:51 a.m. |
Created at: April 28, 2026, 12:51 p.m.