Triple
T29269221
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Centaur T |
E742064
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Centaur upper stage variant |
C10210
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Centaur upper stage variant Context triple: [Centaur T, instanceOf, Centaur upper stage variant]
-
A.
rocket upper stage
chosen
A rocket upper stage is the final propulsion segment of a launch vehicle, designed to operate in near-vacuum conditions to place payloads into their intended orbits or trajectories after lower stages have completed initial ascent.
-
B.
expendable launch vehicle stage
An expendable launch vehicle stage is a non-reusable rocket segment that houses propulsion, propellant, and associated systems, designed to operate for a specific phase of flight and then be discarded once its fuel is depleted.
-
C.
Saturn V mobile launcher
The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
-
D.
orbital launch vehicle first stage
The orbital launch vehicle first stage is the initial propulsion segment of a rocket that provides the primary thrust to lift the vehicle off the ground and accelerate it through the lower atmosphere before separating for subsequent stages to continue to orbit.
-
E.
launch vehicle upper structure
The launch vehicle upper structure is the integrated assembly above the core propulsion stages that houses the payload, guidance systems, and associated support hardware, ensuring structural integrity, environmental protection, and proper deployment during ascent and orbital insertion.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0912124d48190a046642b69407f4c |
completed | April 28, 2026, 10:51 a.m. |
Created at: April 28, 2026, 12:47 p.m.