Triple

T2926907
Position Surface form Disambiguated ID Type / Status
Subject Murr Center E78866 entity
Predicate instanceOf P0 FINISHED
Object athletics center C242 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: athletics center
Context triple: [Murr Center, instanceOf, athletics center]
  • A. indoor athletic facility
    An indoor athletic facility is a covered, climate-controlled space equipped with specialized areas and equipment designed to support a variety of sports, fitness activities, and physical training programs year-round.
  • B. sports and recreation facility chosen
    A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
  • C. athletic club
    An athletic club is an organized group or facility where individuals participate in sports, fitness, and physical training activities, often with shared resources, coaching, and social events.
  • D. athletes' village
    An athletes' village is a dedicated residential complex that houses competitors and team officials during a multi-sport event, providing accommodation, dining, training, medical, and recreational facilities in a secure, centralized environment.
  • E. convention center
    A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b0d40b481908bc2a5fa2e73c3fb completed March 8, 2026, 2:43 p.m.
Created at: March 8, 2026, 2:55 p.m.