Triple
T29253624
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Studio Tram Tour: Behind the Magic |
E741636
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tram tour attraction |
C20177
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tram tour attraction Context triple: [Studio Tram Tour: Behind the Magic, instanceOf, tram tour attraction]
-
A.
stadium tour
A stadium tour is a guided experience that takes visitors behind the scenes of a sports or entertainment venue, showcasing areas such as locker rooms, VIP suites, and the playing field while sharing the venue’s history and operations.
-
B.
carnival attraction
A carnival attraction is an entertaining feature or ride at a fair or amusement event designed to draw visitors with sensory excitement, novelty, and fun.
-
C.
theme park show
A theme park show is a live or pre-recorded entertainment performance within a theme park, designed to engage guests through storytelling, music, special effects, and character appearances that enhance the park’s overall themed experience.
-
D.
amusement park attraction
An amusement park attraction is a designed entertainment feature or ride that provides guests with thrilling, enjoyable, or immersive experiences within a themed recreational setting.
-
E.
themed entertainment attraction
chosen
A themed entertainment attraction is an immersive, story-driven experience that combines environment design, technology, and performance to engage guests in a specific narrative or world.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0911eba2c8190b07cd2fdf91422c9 |
completed | April 28, 2026, 10:51 a.m. |
Created at: April 28, 2026, 12:35 p.m.