Triple

T29187009
Position Surface form Disambiguated ID Type / Status
Subject Yamuna Action Plan Phase I E739894 entity
Predicate instanceOf P0 FINISHED
Object river pollution control project C2343 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river pollution control project
Context triple: [Yamuna Action Plan Phase I, instanceOf, river pollution control project]
  • A. water pollution control program chosen
    A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
  • B. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. river protection program
    A river protection program is an organized initiative that plans, implements, and monitors actions to preserve and restore the ecological health, water quality, and sustainable use of river systems.
  • D. water pollution control law
    Water pollution control law is a body of legal rules and regulations designed to prevent, reduce, and remediate contamination of water resources by setting standards, permitting discharges, and enforcing compliance to protect human health and the environment.
  • E. reclamation project
    A reclamation project is an organized effort to restore, rehabilitate, or repurpose disturbed or degraded land, water, or resources for productive or environmentally sustainable use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f07cb74c2c8190ad396487fcb4fde6 completed April 28, 2026, 9:24 a.m.
Created at: April 28, 2026, noon