Triple
T29172550
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Measure M transportation sales tax program |
E739510
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | local transportation funding measure |
C25454
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: local transportation funding measure Context triple: [Measure M transportation sales tax program, instanceOf, local transportation funding measure]
-
A.
transportation funding measure
chosen
A transportation funding measure is a policy instrument, often a ballot initiative or legislative act, that authorizes and allocates dedicated revenue sources to plan, build, operate, and maintain transportation infrastructure and services.
-
B.
public transportation funding program
A public transportation funding program is a structured initiative that allocates financial resources to plan, develop, operate, and maintain shared transit services and related infrastructure for the general public.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
short-range transportation plan
A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
-
E.
transportation funding authorization act
A transportation funding authorization act is a legislative measure that approves and allocates financial resources for the planning, construction, operation, and maintenance of transportation infrastructure and related programs over a specified period.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f07cb6394c8190ab7842c48e699e2a |
completed | April 28, 2026, 9:24 a.m. |
Created at: April 28, 2026, 11:53 a.m.