Triple

T29156156
Position Surface form Disambiguated ID Type / Status
Subject Former Marine Corps Air Station Tustin E739047 entity
Predicate instanceOf P0 FINISHED
Object decommissioned military installation C21114 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: decommissioned military installation
Context triple: [Former Marine Corps Air Station Tustin, instanceOf, decommissioned military installation]
  • A. military installation
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • B. former military complex chosen
    A former military complex is a decommissioned installation once used for defense or armed forces operations, now repurposed, abandoned, or awaiting redevelopment.
  • C. former air force base
    A former air force base is a decommissioned military airfield and associated facilities that once supported air force operations but has since been closed, repurposed, or abandoned.
  • D. former military training camp
    A former military training camp is a decommissioned facility once used to prepare armed forces personnel through drills, exercises, and instruction, now repurposed, abandoned, or preserved for historical or alternative uses.
  • E. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f07cb528fc8190a556b73990c347c8 completed April 28, 2026, 9:24 a.m.
Created at: April 28, 2026, 11:45 a.m.