Triple
T29117164
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chula Vista Elite Athlete Training Center |
E737078
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Paralympic training center |
C242
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Paralympic training center Context triple: [Chula Vista Elite Athlete Training Center, instanceOf, Paralympic training center]
-
A.
Paralympic high-performance program
A Paralympic high-performance program is an organized, elite-level system that identifies, develops, and supports athletes with disabilities to achieve optimal performance at national and international Paralympic competitions.
-
B.
sports and recreation facility
chosen
A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
-
C.
sports and education complex
A sports and education complex is a multifunctional facility that integrates athletic venues with academic and training spaces to support both physical development and educational activities.
-
D.
energy training facility
An energy training facility is a specialized center where individuals and organizations learn, practice, and develop skills related to energy production, management, efficiency, and safety using dedicated equipment and simulated environments.
-
E.
American football training facility
An American football training facility is a specialized complex equipped with fields, weight rooms, meeting spaces, and technology designed to support the physical, tactical, and strategic development of football players and teams.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f077ed54e08190bb02a744e8121a66 |
completed | April 28, 2026, 9:03 a.m. |
Created at: April 28, 2026, 11:23 a.m.