Triple
T29102022
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shapingba border area |
E736660
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transitional urban zone |
C41062
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transitional urban zone Context triple: [Shapingba border area, instanceOf, transitional urban zone]
-
A.
urban-edge landscape
chosen
An urban-edge landscape is a transitional zone where city infrastructure meets natural or semi-natural environments, blending built elements with green spaces to mediate ecological, social, and visual boundaries.
-
B.
urban spur
An urban spur is a short, secondary roadway or extension branching off a main urban route to provide direct access to adjacent streets, neighborhoods, or facilities.
-
C.
urban ensemble
An urban ensemble is a cohesive grouping of buildings, public spaces, and infrastructure whose combined form, function, and character create a distinct, perceivable urban identity.
-
D.
urban block
An urban block is a contiguous group of buildings and parcels of land bounded by streets or public spaces, forming a basic unit of urban fabric and development.
-
E.
urban-type settlement
An urban-type settlement is a semi-urban locality that exhibits some characteristics of a town or small city—such as concentrated housing, infrastructure, and non-agricultural employment—without meeting all the criteria for full city status.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f077ec765c81909474c88bcc8bab43 |
completed | April 28, 2026, 9:03 a.m. |
Created at: April 28, 2026, 11:12 a.m.