Triple
T29099673
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tune-Yards |
E735105
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental pop project |
C43556
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental pop project Context triple: [Tune-Yards, instanceOf, experimental pop project]
-
A.
ambient pop project
An ambient pop project is a musical endeavor that blends atmospheric, textural soundscapes with melodic, song-oriented structures to create immersive, emotionally evocative listening experiences.
-
B.
experimental folk project
An experimental folk project is a musical endeavor that blends traditional folk elements with unconventional structures, sounds, and production techniques to explore new artistic directions.
-
C.
experimental musical
An experimental musical is a theatrical work that challenges traditional musical conventions through unconventional storytelling, innovative music and sound design, and nonstandard structures or performance techniques.
-
D.
indie pop project
chosen
An indie pop project is a music endeavor characterized by independently produced, melody-driven songs that blend pop sensibilities with alternative or experimental aesthetics.
-
E.
experimental house
An experimental house is a residential structure designed and built to test innovative architectural concepts, materials, technologies, or living arrangements that challenge conventional housing norms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f05b0ed66481908f2e864fa550d2f1 |
completed | April 28, 2026, 7 a.m. |
Created at: April 28, 2026, 11:11 a.m.