Triple

T29080973
Position Surface form Disambiguated ID Type / Status
Subject Zone 3 (Île-de-France fare zone) E733980 entity
Predicate instanceOf P0 FINISHED
Object administrative transport zone C42172 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: administrative transport zone
Context triple: [Zone 3 (Île-de-France fare zone), instanceOf, administrative transport zone]
  • A. transfer zone
    A transfer zone is a structural region in the Earth's crust where deformation, stress, or displacement is transferred between adjacent tectonic or sedimentary domains, often linking segments of faults, basins, or plate boundaries.
  • B. transition zone
    A transition zone is a boundary region where two distinct systems, phases, or environments meet and gradually change into one another, exhibiting mixed or intermediate characteristics.
  • C. demilitarized zone arrangement
    A demilitarized zone arrangement is a structured agreement or configuration that establishes a buffer area where military forces, weapons, or hostile activities are restricted or prohibited to reduce conflict and enhance security between opposing parties.
  • D. Verwaltungseinheit
    Eine Verwaltungseinheit ist eine organisatorische Einheit innerhalb einer öffentlichen oder privaten Institution, die für die Erfüllung bestimmter Verwaltungsaufgaben und die Umsetzung von Richtlinien in einem abgegrenzten Zuständigkeitsbereich verantwortlich ist.
  • E. transit service area chosen
    A transit service area is the geographic region within which a public transportation provider offers routes, stops, and related services to riders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b0c0f28819086eae6e84f2ae472 completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 10:55 a.m.