Triple
T29078903
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gisele Yashar |
E733917
|
entity |
| Predicate | statusInFastAndFurious6 |
P120609
|
FINISHED |
| Object | presumed dead |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: presumed dead | Statement: [Gisele Yashar, statusInFastAndFurious6, presumed dead]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: statusInFastAndFurious6 Context triple: [Gisele Yashar, statusInFastAndFurious6, presumed dead]
-
A.
statusInAvengersInfinityWar
Indicates the character’s role, condition, or situation specifically during the events of the film *Avengers: Infinity War*.
-
B.
statusDuringFilm
chosen
Indicates that a particular status or condition holds for an entity during the time span in which a specified film takes place or is being made.
-
C.
statusInFirstFilm
Indicates the role, condition, or situation an entity has in its first film appearance.
-
D.
spectreStatus
Indicates the current state or condition of a spectre-related entity or process, such as whether it is active, inactive, pending, or in another defined status.
-
E.
isFastPaced
Indicates that an activity, event, or process proceeds quickly with rapid progression and little downtime.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f05b0c0f28819086eae6e84f2ae472 |
completed | April 28, 2026, 7 a.m. |
| NER | Named-entity recognition | batch_69fd2cf39b0c8190811b8a6fa9410560 |
completed | May 8, 2026, 12:23 a.m. |
| PD | Predicate disambiguation | batch_69fd2ad8dd988190a9899701ba00d917 |
completed | May 8, 2026, 12:14 a.m. |
Created at: April 28, 2026, 10:52 a.m.