Triple
T2904062
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan of Manila |
E62721
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Daniel Burnham plan |
C22
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Daniel Burnham plan Context triple: [Plan of Manila, instanceOf, Daniel Burnham plan]
-
A.
planned city
chosen
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
B.
civic skyscraper
A civic skyscraper is a tall, prominently located high-rise building that houses public or governmental functions, symbolizing civic identity and serving as a hub for community services and administration.
-
C.
modernist city
A modernist city is an urban environment characterized by functionalist architecture, rational planning, and an emphasis on efficiency, technology, and the separation of spaces for living, working, and recreation.
-
D.
Beaux-Arts building
A Beaux-Arts building is a grand, formally composed structure characterized by classical symmetry, rich ornamentation, and monumental scale, reflecting the academic architectural principles of the École des Beaux-Arts in Paris.
-
E.
Metropolis
A Metropolis is a large, densely populated urban center that serves as a primary hub for economic, cultural, political, and social activities within a region or country.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c3e070c8190b78d3d2c005876dd |
completed | March 6, 2026, 9:50 p.m. |
Created at: March 6, 2026, 10:11 p.m.